PRODUCTIVITY ANALYSIS OF FLOOR HERONING WORKERS USING WORK SAMPLING METHOD

  • Waldemar Waldemar Universitas Muhammadiyah Sukabumi
  • Nia Kartika Universitas Muhammadiyah Sukabumi
  • Siti Muawanah Robial Universitas Muhammadiyah Sukabumi
Keywords: Productivity, Wwork sampling, Reinforcing

Abstract

Productivity is the ability to produce labor in completing the specified number of workers and determines the success of project implementation. Determination of minimum production through worker productivity analysis needs to be considered because it is correlated with the time of completion of work and affects the amount of project implementation costs required. The purpose of this study was to determine the productivity of iron workers in the construction project of the Aysha Islamic Hospital - Perum Accropolis Karadenan Cibinong Bogor. The method used for measuring productivity is work sampling with a productivity assessment approach of 12 (twelve) floor plate iron workers. The productivity value of iron workers varies every day, on the second day the lowest productivity is 28.85 Kg/Hour-Person and 33.55 Kg/Hour-Person on the thirteenth day being the highest productivity value. The average productivity obtained is 31.02 Kg/Hour-Person with a Labor Utilization Rate (LUR) of 74.27% over a span of 7 hours for 14 days.

 

Keywords: Productivity, Work sampling, Reinforcing

References

Andi, 2003, Handout mata kuliah Construction Project Administration, Universitas Petra, Indonesia

Andriani, D. P., Anugrah, B., & Islami, A. D. (2017). Aplikasi Metode Work Sampling Untuk Menghitung Waktu Baku dan Kapasitas Produksi Pada Industri Keramik. Seminar Nasional IENACO, 151–158.

Ahuja, H.N., 1994, Project Management Techniques in Planning and Controlling Construction Projects, Jhon Wiley & Sons, Inc, New York.

Alaie, M.R.K., Dizaji, M.R, Dadjoyan, A and Anvarian, J.P., 2012, Effective Factors in the Existence of Waste Time and its Effects on Product System, Journal of Advances in Environmental Biology, Vol.6, pp. 1494-1502

Alwi, S., Hampson, K., and Mohamed, S. (2002). Waste in The Indonesian Construction Project, Proceedings of the 1st International Conferences of CIB W107, South Africa, pp. 305-315

Bartol, K, M.and Martin, D, C. (1998). Management: InternationalEdition, McGraw-Hill, USA.

Bernolak I. Effective measurement and successful elements of company productivity: The basis of competitiveness and world prosperity. International Journal of Production Economics 1997; 52(1-2): 203- 213.

Boy, R.A, 1986, Improving Total Corporate Productivity, Thomson Learning, 1986

Chilwal K, Mishra AK. Impact of Performance on profitability of small hydropower projects in Nepal, International Journal of Current Research 2018; 10(1): 63918-63925.

Dalela, S.(2002). Text Book of Work Study and Ergonomics. Nai Sarak, Delhi: Standard Publisher Distributors.

D. Diniaty and R. Febriadi, “Analisis Beban Kerja dengan Menggunakan Metode Work Sampling,” J. Tek. Ind., vol. 1, no. 2, pp. 60–69, 2015.

Dell’Isola, M.D., 2003, Detailed Cost Estimating, Supplemental Architectural Services, Virginia

Dharmawan, H. I. (2020) Analisis Produktivitas Tenaga Kerja pada Pekerjaan Pembesian Kolom (Studi Kasus: Proyek Pembangunan Apartemen Yudhistira Tower Yogyakarta). Universitas Islam Indonesia yogyakarta.

Dimyati dan Nurjaman. 2014. Manajemen Proyek. Yogyakarta: Pustaka Setia.

Dipohusodo, I., 1996, Manajemen Proyek Dan Konstruksi Jilid 2, Penerbit Kanisius.

Elizar, Harmiyati, Santoso, R. A., & Irawan, M. N. (2020). Analisis Produktivitas Pekerja Dengan Konsep Value Stream MappingPada Pekerjaan Kolom dan Balok. Jurnal Teknik Sipil, 6(1), 31–40.

EnShassi A, Mohamed S, Mayer P et al. Benchmarking masonry labor productivity. International Journal of Productivity and Performance Management 2007; 56(4): 358-368, 2007.

Firman kresna, B. S. & Dewita H. (2016). Produktivitas pekerja bekisting dan pembesian dengan menggunakan metode work sampling pada proyek gedung. Produktivitas Pekerja Bekisting Dan Pembesian Dengan Menggunakan Metode Work Sampling Pada Proyek Gedung, Universitas Tama Jagakarsa. 11(9), 1689–1699.

Groover MP. Work systems and the methods, measurement, and management of work. Pearson Prentice Hall Upper Saddle River, NJ. 2007.

G. Yanti, P. Studi, T. Sipil, U. Lancang, L. U. Rate, and W. Sampling, “Produktivitas Tenaga Kerja dengan Metode Work Sampling Proyek Perumahan di Kota Pekanbaru,” vol. 3, no. 2, pp. 100– 106, 2017.

Hanna AS, Chang CK, Sullivan T et al. Impact of shift work on labor productivity for labor intensive contractor. Journal of construction engineering and management 2008; 134(3): 197-204.

Haryoko, S. (2009). Efektivitas Pemanfaatan Media Audio-Visual Sebagai Alternatif Optimalisasi Model Pembelajaran. Jurnal Edukasi Elektro, 5(1), 1–10.

Jarkas, A. M. (2010). !Analysis and Measurement of Buildability Factors Affecting Edge Formwork.• Journal of Engineering Science and Technology Review, 142-150.

J. Jono, “Pengukuran Beban Kerja Tenaga Kerja dengan Metode Work Sampling (Studi Kasus di PT. XY Yogyakarta),” Spektrum Ind., vol. 13, no. 2, pp. 205–216, 2015, doi: 10.12928/si.v13i2.2697.

Joshi, P., & Shrestha, S. K. (2019). Analysis of Labor Productivity During Concreting Operation in Building Construction of Kathmandu Valley. Journal of Advanced Research in Construction and Urban Architecture, 4(3), 1–7.

Lawaju, N., Parajuli, N., & Shrestha, S. K. (2021). Analysis of Labor Productivity of Brick Masonry Work in Building Construction in. Journal of Advanced College of Engineering and Management, 6, 159–175.

Leonardy, E., & Sekarsari, J. (2020). Analisis Koefisien Pekerjaan Pembesian Pada Konstruksi Gedung Bertingkat. JMTS: Jurnal Mitra Teknik Sipil, 3(4), 1327. https://doi.org/10.24912/jmts.v3i4.8393

Luu, T.V., Kim, S.Y., Cao.H.L and Park, Y.M. (2008) Performance Measurement of Construction

Maharani, Y. S. (2015). Efektivitas Multimedia Pembelajaran Interaktif Berbasis Kurikulum 2013. Indonesian Journal of Curriculum and Educational Technology Studies, 3(1), 31–40. https://doi.org/10.15294/ijcets.v3i1.8683

M. Taufan, “Penentuan Jumlah Tenaga Kerja yang Optimal dengan Metode Work Sampling Di Ikm Griya Mank Gudo Jombang,” J. Valtech, vol. 01, no. 01, pp. 31–35, 2018.

Muchdarsyah, Sinungan. (2003). Produktivitas Apa dan Bagaimana. Jakarta: Bumi Aksara.

Nurhayati. 2010. Manajemen Proyek. Yogyakarta : Graha Ilmu

Olomoaiye, P.O., Jayawardane, A.K.W., and Harris, F.C., 1998, Construction Productivity Management, Addison Wesley Longman, Edinburgh Gate.

Prasetyo, D. A., Anthony, Chandra, H. P., & Ratnawidjaja, S. (2017). Analisis Produktivitas Tenaga Kerja Dengan Metode Work Sampling : Studi Kasus Proyek Tunjungan Plaza 6. Jurnal Dimensi Pratama Teknik Sipil, 1–8. https://media.neliti.com/media/publications/78074-ID-analisis-produktivitas-tenaga-kerja-deng.pdf

Pilcher, R., 1992, Principles of Construction Management, Mc.Graw Hill, Singapore.

Rahmat, R., & Soekiman, A. (2018). Kajian Produktivitas Tenaga Kerja (Tukang dan Pekerja) pada Proyek Konstruksi berdasarkan Koefisien Tenaga Kerja Penelitian Terdahulu dan SNI.

Rizky, A. Z. P, & Nugraheni F. (2019) Analisis Produktivitas Tenaga Kerja Di Lapangan Pada Pekerjaan Kolom. Universitas islam indonesia.

Santoso, D.A., Supriyadi, A. (2010). Perhitungan Waktu Baku Dengan Metode Work Sampling, Prosiding Seminar Nasional Sains dan Teknologi, Unwahas, Semarang.

Sedarmayanti. 2009. Sumber Daya Manusia dan Produktivitas Kerja. Bandung. Penerbit CV. Mandar Maju.

Simanjuntak, P.J. 2005. Manajemen dan Evaluasi Kinerja. Lembaga Penerbit Fakultas Ekonomi. Jakarta: Universitas Indonesia

Published
2022-05-21
How to Cite
Waldemar, W., Kartika, N., & Muawanah Robial, S. (2022). PRODUCTIVITY ANALYSIS OF FLOOR HERONING WORKERS USING WORK SAMPLING METHOD. Jurnal Pensil : Pendidikan Teknik Sipil, 11(2), 162 - 170. https://doi.org/10.21009/jpensil.v11i2.25474