[1]
Hindami, G.G., Suroso, A. and Amin, M. 2024. ANALYSIS OF THE INFLUENCE OF ORDER VARIATION FACTORS ON THE COSTS AND TIME OF IMPLEMENTING CHANNEL DIVERCTION INFRASTRUCTURE CONSTRUCTION PROJECTS IN RESIDENTIAL AREAS. Jurnal Pensil : Pendidikan Teknik Sipil. 13, 2 (May 2024), 130 - 144. DOI:https://doi.org/10.21009/jpensil.v13i2.43872.